Timberlake, Chapin, South Carolina

Location — Chapin, South Carolina

Project Type — Kitchen gut renovation

Scope — Kitchen and pantry, taken back to the shell with the original floor retained

Services — Kitchen design, custom cabinetry design, custom window treatments, lighting design, soft furnishings

Millwork and Built-Ins — Custom cabinetry throughout, custom hood, new pantry

Custom Elements — Custom hood, banquette cushions, custom window treatments, new light fixtures

Nearest Water — Lake Murray

Duration — Five to six months

This kitchen is in Chapin, five minutes from my own front door, and it is a useful example of what a gut renovation is actually for. We took the room back to nothing. New cabinetry, new pantry, new lighting, new window treatments, a custom hood. Everything except the floor.

The floor stayed, and that single decision is the reason the room works. It had age in it, the kind of worn and settled quality that cannot be bought or specified or ordered in. Laying new flooring would have given us a kitchen that looked finished on the day it was photographed and generic within a year. Keeping it gave us a kitchen with an old world feeling from the first morning, and it meant every other choice in the room had something honest to answer to.

The custom cabinetry was designed around what remained rather than imposed upon it. Finishes were selected against the tone of the existing floor, and proportions were set to the room as we found it. The custom hood anchors the range wall and does the work a focal point should do, which is to give the eye somewhere to rest before it takes in everything else.

The pantry was planned for how this family actually cooks. New banquette cushions and window treatments soften a room that is otherwise full of hard surfaces, and the new light fixtures were chosen to be seen rather than merely to illuminate.

The project ran five to six months. Knowing what to keep is the hardest part of a renovation and the part that most often gets skipped, and it is where I spend the most time on every kitchen I take on in Chapin and around Lake Murray.

Let us design yours next.

This kitchen is a short drive from ours. If you are planning a kitchen in Chapin or on Lake Murray, design plans are delivered within ten days of our meeting.